Friday, April 27, 2012
GE Aviation Facility Expansion
Its been almost a year now since GE Aviation approached Motion Savers with their material handling needs in their facility expansion project. With the long history between GE Aviation, Motion Savers and TC/American it was no surprise that they looked to TC/American for their Patented Track crane and runway systems. The scope of this project required the use of 30 cranes ranging in capacity from 1 metric ton to 4 metric ton, and over 2900' of runway. With the time frame GE Aviation had available, Motion Savers and TC/American quite the task at hand. Through hard work and a little overtime on the week of April 6th the last cranes shipped on schedule and within budget. Proving once again that TC/American can get the job done and done well. The photo shows one of the first batches of cranes being worked on.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment