Friday, December 14, 2012

The Lowerator is almost complete, just making the final adjustments to the controls before testing.
 

3MT9-10000-B drive on the 3ET38000-8SRB end truck will be driving the Lowerator at 100 FPM with a 10:1 ratio variable frequency drive.
 Well here it is complete, tested and ready to go.

The Lowerator should be installed by the end of next week, at which time we can show you what it looks like installed.
 
 
There it goes, another successful project with an on time delivery. 